One Sub, Division 31 Through 32
Commercial site services, self-performed — no second tier.
Site earthwork through landscape establishment, self-performed with our own crews and equipment out of New Auburn. You carry one subcontract instead of five, and one phone number when the schedule moves.
Scopes we self-perform
Erosion Control & SWPPP
Division 31 20 00
We install and maintain the erosion control package for the life of the job and keep the site inspection-ready.
- Silt fence, wattles, and inlet protection
- Rock construction entrances and tracking pads
- Ditch checks, riprap outlets, and slope matting
- Weekly and post-rain inspection maintenance
- Sweeping and sediment removal
- Removal and site closeout at stabilization
Fine Grading, Seeding & Site Restoration
Division 32 90 00
Final grade, topsoil respread, and permanent stabilization — the scope that closes out a site and releases the bond.
- Fine grade to plan elevations and swale flow lines
- Topsoil respread at specified depth
- Seed, fertilizer, and mulch or hydroseed
- Sod and erosion control blanket
- Establishment period watering and repair
- Punch list grading and restoration
Engineered Segmental Retaining Walls
Division 32 32 23
Block wall installation to plan, including delegated design when the drawings call for a sealed submittal.
- Delegated sealed design by a licensed Wisconsin PE
- Geogrid-reinforced SRW systems
- Leveling pad, drainage stone, and drain tile
- Compaction testing coordination
- Cap, coping, and guardrail coordination
- As-built and closeout documentation
Irrigation Sleeving
Division 32 84 00
Sleeves set under pavement and walks before paving, dimensioned and staked so the irrigation sub finds them later.
- PVC sleeving under drives, walks, and islands
- Set and marked ahead of paving operations
- Depths and end locations recorded on as-builts
- Coordination with paving and utility schedules
Landscape Installation & Establishment
Division 32 93 00
Plantings, beds, and mulch installed to the plant schedule, then maintained through the establishment period.
- Trees, shrubs, perennials, and ornamental grasses
- Bed prep, edging, weed fabric, and mulch
- Staking, guying, and watering bags
- Plant material substitutions priced in writing
- Establishment period maintenance
- Warranty walk and replacements
Excavation & Grading
Division 31 20 00
Mass and rough grading, cut and fill balance, and the dirt work that gets a site to subgrade.
- Stripping, stockpiling, and respread
- Cut and fill, balance, and haul in or out
- Rough grade to subgrade tolerance
- Pond, swale, and ditch excavation
- Building pad and aggregate base placement
- Backfill and compaction
How we bid
- Quantities taken off the plans, not guessed from a walk-through.
- Allowances carried with unit prices so they reconcile in both directions — credit back if the quantity comes in light, priced the same way if it runs over.
- A unit price schedule provided with every proposal, so change orders are already priced before anyone asks.
Common questions
Send us the plans.
Give us the bid date and the scope and we will get you a number with a unit price schedule attached.
